Investing in the next generation by creating tomorrow together
Project NEXT is our commitment to providing safe, modern, and vibrant educational spaces for every student. Delivering high-value capital improvements while keeping our local tax burden stable.
Project NEXT Priorities
- Protective Upgrades: Upgrading aging roofs and modernizing HVAC systems to ensure indoor air quality, thermal comfort, and safety.
- Modern Learning & Access: Outfitting environments with flexible furniture, playground safety improvements, and parking reconfiguration.
Infrastructure Priorities
Modernizing climate control systems across District 123 to ensure indoor air quality, thermal comfort, and energy efficiency for all students and staff.
Full Modernization across 7 District Buildings: System-wide replacement of outdated climate infrastructure across all 7 campus facilities, ensuring consistent, high-quality indoor environmental standards for every classroom.
100% Fresh Air & Comfort: Filtration and modern ventilation systems dramatically improve indoor air hygiene. Year-round, reliable climate control reduces classroom disruptions and energy waste.
District 123 is executing a 5-year priority master plan focused on strategic roofing upgrades to prevent structural damage and secure safe, uninterrupted learning environments.
- Targeted Upgrades: Installs high-specification commercial roofing systems designed for 20 years of guaranteed protection across the McGugan, Sward, Gaddis, Brandt, Kolmar, and Hometown campuses.
- Proactive Protection: Prevents structural water damage and eliminates costly emergency repair cycles to safeguard school facilities.
Addressing critical safety hazards by replacing cracked, aging asphalt parking surfaces, reconfiguring campus traffic flows to secure safer, highly accessible environments, and clearly branding each school building with contemporary signage.
- Safety & Pedestrian Security: Replacing severely degraded asphalt eliminates dangerous tripping hazards. High-visibility professional striping guarantees safer walking lanes, designated crosswalks, and strictly enforced fire zones.
- Optimized Dropoff Flow: Reconfigured drop-off paths isolate heavy yellow bus patterns from standard passenger vehicles to streamline peak times. Engineered stacking lanes minimize bottlenecking on local streets.
- Universal Accessibility (ADA): Modern design creates grade-level transitions, curb cuts, and compliant slopes directly connecting parking stalls to school entries for wheelchair access.
Modern Learning Environments
Replacing static, traditional desks with agile and adaptive furniture systems and new flooring to support active collaboration, diverse instructional modes, and student-centered learning.
- Collaborative Layouts: Lightweight, wheeled desks and nesting chairs allow teachers to shift from lectures to group work quickly. Geometric table shapes join together seamlessly for small-group breakout sessions.
- Ergonomics & Comfort: Multi-size ergonomic seating options support proper posture, helping students maintain physical comfort and focus. Varied height surfaces and sensory-friendly motion seating accommodate diverse learning needs.
Modernizing outdoor play facilities across our elementary schools to guarantee physical safety, foster social development, and create highly inclusive recreational environments.
- 5 Sites (District-Wide Upgrades): Comprehensive modernization of outdoor play structures across all 5 elementary campuses. Revitalized parks serve as neighborhood recreation hubs during non-school hours.
- Cushioned Surfacing & Safety: Replacing aging mulch or dirt with highly engineered, shock-absorbing cushioned material to prevent critical injuries. Universal, flat, and seamless design ensures wheelchair accessibility.
This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.